Semester 1 

 

November 30-December 4

Hybrid Learning

Day of the Week

Assignments 

Monday

Start Ornament
In-Person will get supplies for circuits

 

Tuesday

Work on Ornament

 

Wednesday

Circuit Notes

 

Thursday

Ornament Finished
In-Person will get supplies for circuits

 

Friday

Paper Circuits: Parallel Circuit

 

 

Paper Circuits: Series Circuit

 

 

Clip Art Pop-up Video for students working ahead

 

 

 

 


 

November 23 & 24

Day of the Week

Assignments 

Monday

Bikes and Gears

 

 

Tuesday


Bikes, Gears and Gear Ratio Quiz

 


 


November 16-20

 

Day of the Week

Assignments 

Monday

Create Your Gear

 

 

Tuesday

Put your name on your Gear

 

Wednesday

Send Gear to the Printer

 

Thursday

Gear R&P 1

 

Friday

Gear R&P 2
Email Check-in #2B due

 


November 9-13

Day of the Week

Assignments 

Monday

Gears Introduction Notes

 

 

Tuesday

Gear Ratio Notes

 

Wednesday

Gear Ratio Practice

 

Thursday

Gear Ratio & Proportions

 

Friday

Gear Generator


November 2-6 Click here for all of this weeks Daily Info

Day of the Week

Assignments

Monday 

Activate Picture Link


Begin working on Bridge Report 

 

 

 

 

 

 

 

Tuesday-Thursday

Complete Bridge Report by the end of class Thursday.

 

 

Meet with Ms. Grear to have bridge graded

 

 

 

Friday

Bridge Strength Testing (Volunteers only)

 

Cargo Bridge

 

Cargo Bridge 2

  

 


October 26-30 Click here for all of this weeks Daily Info

Day of the Week

Assignments

Monday & Tuesday

Build the other side of the Bridge

 

Method 2

 

 

 

Wednesday & Thursday

Attach the sides of your bridge to the bridge deck

 

 

 

 

Friday

Finish your bridge: 
Add a top, reinforce the bottom, decorate, etc. 
 

 

 

 

 

Pumpkin to Copy and use to make Jack-O-Lantern

 

 

 

 

 

 


October 19-23 Click here for all of this weeks Daily Info

Day of the Week

Assignments

Monday

Prepare for Bridge Construction
~Put bridge drawing on cardboard and cover with plastic wrap

~Watch Video and answer question on Canvas

 

Tuesday

Build Beams for Bridge and upload beam picture to Canvas

 

 

 

Wednesday-Thursday

Build One Truss (Side of Bridge)
Choose one Method for constructing both sides. 
Upload picture of finished side to Canvas. 

 

 

 

 Method 2

 

 

Friday

Build Bridge Deck

 

Email Check in #7 due


 

October 12-16 Click here for all of the Daily Info directions for the week

Day of the Week

Assignments

Monday

Truss Notes

 

Tuesday

Bridge Design and Truss Quiz

Bridge Planning

 

Wednesday-Thursday

Truss Drawing

 

 

Friday

Email Check In #6 Due

 

Code.org Lesson 10 Due

Start bridge construction if done with EVERYTHING!

 


October 5-9 Click here for all of the Daily Info directions for the week

Day of the Week

Assignments 

Monday

Beams Notes

Set up Journal for Beam Testing

Tuesday Beam Testing Data Collection
Wednesday

Beams Quiz

Bridge Design Notes

 

Thursday

Line Drawing Assignment

 

Friday

Line Drawing Assignment Due

Email Check in #5 Due

Code.org Lesson 9 Due

 

 

September  28- October 2 Click here for all of the Daily Info directions for the week

Day of the Week

Assignments 

Monday

Printer Setting Notes

Join Polar Cloud 

Send Keychain to Printer

Name Brick Instructions

Tuesday

Last day to send Keychain

Name Brick Instructions

Work on Code.org

Tinkercad Quiz last 20 minutes of class

Wednesday

Forces on Structures Notes

 

Thursday

Forces on Structures Web Labs

 

Friday

Forces on Structures Quiz

Email Check In #4

Code.org Lesson 8


 

September 21-25: Click here for all of the Daily Info directions for the week

Day of the Week

Assignments

Monday

Learn How to Use Tinkercad

 

Tuesday

Name Keychain Part 1

3D Printing Notes Quiz

Wendesday

Name Keychain Part 2

 

 

 

Thursday

Name Keychain Part 3 & 4

 

 

Friday

Name Keychain 4 and Name Keychain Project Turn in

KeyChain Checklist: Go through this BEFORE submitting the keychain on Canvas.

  1. Is it your name?

  2. Are all of the letters attached to each other?

  3. Where the letters are attached, is it enough that they will be strong after printing?

  4. Do you have a spot for the keyring to go through and is it attached to the rest of the keychain?

  5. Is the section for the keyring the correct size and shape? 

  6. Is everything flat and aligned to the bottom? (the bottom dot of the z-axis)

  7. Is the entire keychain the only thing in the file and one group?

  8. Is the entire keychain between 4.00mm and 10.00mm thick? (z-axis)

  9. Is the entire keychain less than 80.00mm in length? (x-axis)

  10. Is the entire keychain less than 25.00mm in width? (y-axis)

 

Email check-in #3 is Due


Code.org Lessons 6 & 7 are Due

 


September 14-18: Click here for all of the Daily Info directions for the week

Day

Assignments

Monday

Number Pages in Journal
Continue working on Code.org

Tuesday

Set up Journal

Continue working on Code.org

Wednesday

What is 3D printing? Notes

Work on Code.org

Email Check In #2 Opens

Thursday

Types of 3D Printers Notes

Work on Code.org

Friday

3D Printer Parts Notes

Code.org Levels 4 & 5 due today

Email Check in #2 due today

 


September 7-11

Day

Assignments

Monday

Labor Day

Tuesday

First Day of School
Access Canvas
About Ms. Grear
Syllabus
Class Website

Wednesday

Access Canvas in Advisory
Name Cards

Thursday

Check out class website: syllabus, about Ms. Grear, Week Snapshot, etc

Interest Survey on Canvas
 

Register on Code.org Canvas Assignment

Friday

Email Assignment #1 Due

Video Of Email Check In #1 

 


Work on Code.org